一、对一九八六年工作的回顾一九八六年,是我省水利工作出现新转机的一年,主要农现在:(一)超额完成了各项计划任务桃曲坡水库已全部竣工,东雷抽黄原上部分和引酉工程也接近了尾声。群众性的水利建设出现了新高潮,春季和冬季发动了一、二百万劳力上陈,大搞农村水利建设,共完成土石方工程量7490万立方米,恢复了近百万亩灌溉面积,完成灌区平整土地40万亩,为计划任务的114%;一些地方出现了打井和机井测试改造小热潮,新增配套机井2005眼,测试改造机井2330眼,均超额完成了计划。全省新增有效灌溉面积27.55万亩,累计达到1867.7万亩。同时
I. A Review of the Work in 1986 In 1986, a year of new turning point in the water conservancy work in our province. Major agricultural now: (1) Over-fulfilled various tasks of the project. Taquipo Reservoir has been completed On the other hand, the project on the part of Donglei and Huangshan was also coming to an end. Massive water conservancy construction has reached a new upsurge. In the spring and winter, one to two million labors were launched and large-scale rural water conservancy projects were completed. The total volume of earth and stone works was 74.9 million cubic meters and nearly one million mu of irrigated area was restored. Irrigation area of 400000 acres of land leveling, 114% of the planned tasks; drilling and drilling wells in some places there has been a small test of transformation and upgrading, the new supporting wells 2005, 2330 eye test wells were modified, overfulfilled the plan. The province added an effective irrigation area of 27.55 million mu, a total of 18.67 million mu. Simultaneously