紧水滩围堰工程,利用补偿收缩混凝土进行81m长块浇筑的快速施工试验,取得了成功并获得水电部科技二等奖。本文是介绍这一长块应用补偿收缩混凝土的设计论证与观测成果分析。
Tight beach cofferdam project, the use of compensated shrinkage concrete 81m long block pouring rapid construction test and achieved success and won the second prize of MEP Technology. This article is to introduce the application of this long block shrinkage of concrete design demonstration and analysis of the results.