论文部分内容阅读
海河流域水资源供需平衡和供水规划是两项任务,前者是国家计委和水电部1982年向全国布置的重点科研项目,后者是海河流域补充规划的重要组成部件。这两项任务基本内容相同,但重点和深度有所不同。我们将这两项工作结合进行,由流域内省、直辖市、自治区(省、市、区)和河系规划组、供水规划组共同进行。全流域汇总工作由水电部海河水利委员会(以下简称海委)和水电部天津勘测设计院(以下简称天津院)共同负责。现将本流域水资源供需平衡和供水规划工作方法及主要经验介绍如下。
The Haihe River Basin water supply and demand balance and water supply planning are two tasks, the former is the State Planning Commission and the Ministry of Mines in 1982 to deploy the country’s key scientific research projects, which is the Haihe River Basin Supplementary Planning an important component. The two tasks are basically the same in content, but the emphasis and depth are different. We combine these two tasks and are carried out by the provinces, municipalities and autonomous regions (provinces, municipalities and autonomous regions), river system planning teams and water supply planning teams. The basin-wide pooling work is jointly undertaken by the Ministry of Water Resources and the Haihe River Conservancy Commission (hereinafter referred to as the IOC) and the Tianjin Survey and Design Institute (hereinafter referred to as the Tianjin Institute). Now the basin water supply and demand balance and water supply planning work methods and main experience are as follows.