【摘 要】
:
流入印度马楚(Machhu)Ⅱ号水库的流量超过其最大设计流量6000秒立米二倍,终于造成了历史上最惨的大坝溃决成灾的纪录。官方公布被淹没的摩维镇地区死亡人数是1540人,同时在
论文部分内容阅读
流入印度马楚(Machhu)Ⅱ号水库的流量超过其最大设计流量6000秒立米二倍,终于造成了历史上最惨的大坝溃决成灾的纪录。官方公布被淹没的摩维镇地区死亡人数是1540人,同时在砂石堆中还可以找到许多尸体。据工程师们估计,当记录到最大出流量为10000秒立米时,在古查拉特西岸处流入马楚Ⅱ号水库的最大流量可能大于14000秒立米。当水位无法控制时,18扇弧形闸门中只有15扇能全部打开,其余3扇为电路故障仍然局部关闭着。
The flow into Reservoir II at Machhu II in India exceeded twice the maximum design flow of 6000 seconds and finally resulted in a record of the worst dams in history. The official death toll in the flooded town of Morwell is 1540, and many bodies can be found in the gravel pile. Engineers estimate that when a maximum flow rate of 10,000 seconds is recorded, the maximum flow into the Maju Reservoir at the west bank of the Gucharat may be greater than 14,000 seconds. When the water level was out of control, only 15 of the 18 arc gates were fully open, and the remaining three were partially shut down for circuit failure.
其他文献
[摘要]《机械制图与CAD》课程传统的教学模式,偏重于理论而轻于技能,与技能型人才的培养要求不相适应。因此,高职院校必须办出鲜明的特色,而《机械制图与CAD》课程也应该形成鲜明的课程教学模式。 [关键词]教学模式 课程设计 [中图分类号]G612 [文献标识码]A [文章编号]1006-5962(2013)03(a)-0034-01 《机械制图与CAD》课程是高职机械制造与自动化、数控技术应
本文介绍了流域开发规划和可行性研究阶段的电算模型,借以对各种不同组合梯级电站方案的主要指标和运行特性进行计算和优化,其标准是获得最大的净利益。为节省机时,采用概化
该仪器由 KernEl 经纬仪,DM—501测距仪,固体存储器,以及能显示数字的计算机组成。应用于大坝变形观测中,精度可达±1毫米/公里。现将各部分作简要介绍。模块系统该系统由电
联苯菊酯属于拟除虫菊酯类杀虫杀螨剂,可用于茶小绿叶蝉、白粉虱、潜叶蛾、棉红蜘蛛等多种害虫害螨的防治。自1999年有国外企业登记联苯菊酯原药产品以来,截止到2008年5月,共
作为台湾新电影运动中的代表人物,侯孝贤以其异常简约的电影语言技法追求银幕影像意境美的创造,展现出凝定、悠远、恬淡、空寂的中国古典诗歌审美意境。而侯式长镜头更是以独
由此看出,五年内平均每年增长五十万辆左右。由于我国在“八五”期间汽车工业生产的重点转向轿车,随着一汽、二汽、上海桑塔纳和北京吉普、天津夏利、广州标致“三大”“三
对车架和前叉进行动力分析有实验法和计算法两种,在设计阶段进行动力分析指导设计须用计算法。计算法中主要的是应用有限元动力分析法。FEDAFA是根据摩托车管式车架和前叉的
通过高职高专数学课程设置的现状分析,结合人才培养目标,提出高职高专数学课程设置和改革的设想。
Based on the analysis of the present situation of maths curriculum s
本文针对耗散结构理论视阈下高职院校校园文化系统构建进行研究,将为高职院校校园文化的建设和发展提供一种具有普遍意义的、高效的、动态的文化建设基本框架,能使高职院校保
“活动拦鱼栅”是根据山区水库的特点而设计的一种溢洪道防逃设备,现已在我区三道河水库建成。该水库位于南漳县山区,总库容1.61亿立米,养鱼水面6000亩,库内植被良好,水质肥