论文部分内容阅读
采矿专业软件包第一次鉴定会于5月16~19日在合肥煤矿设计研究院召开.这次鉴定会是根据煤矿设计计算机应用领导小组的安排,经过广大专业人员和电算人员近两年的努力,研制开发完成的,部分软件进行鉴定,这次鉴定会之前,首先在北京进行了预审,其中有10项软件还需要继续补充完善,有18项软件通过了预审并参加鉴定,它们是:“矿井设计劳动组织数据库”、“矿井设计主要技术经济指标数据库”、“矿井主提升、排水、通风数据库”、“煤矿设计储量和煤柱计算”、“煤田勘探程度的设计评价”、“防水闸门硐室受力计算及绘图”、“矿井主运输系统运输方式及参数选择”、“矿井气温预测电算程序”、“煤矿开采地表移动及变形预计计算及绘图”、“矿井通风网络计算程序”、“大断面巷道(硐室)支护计算”、“立井井壁结构设计计算程序”、“立井井筒装备设
The first identification of the mining software package will be held at Hefei Coal Mine Design and Research Institute from May 16 to May 19. This appraisal will be conducted according to the arrangement of leading group for computer application of coal mine design and will be approved by the majority of professionals and computer personnel in the past two years Of the efforts, research and development completed, some of the software for identification, the appraisal will be conducted prior to the first pre-trial in Beijing, of which 10 software also need to continue to perfect, 18 software passed the pre-trial and participate in appraisal, they are : “Mine Design Labor Organization Database”, “Main Technical and Economic Indicators Database of Mine Design”, “Main Mine Uplift, Drainage and Ventilation Database”, “Coal Mine Design Reserves and Coal Pillar Calculation”, “Design Evaluation of Coalfield Exploration Degree” Waterproof gate chamber stress calculation and mapping “,” main transportation system of the mine transportation mode and parameter selection “,” mine temperature prediction calculation program “,” coal mining surface movement and deformation prediction and calculation “and” mine ventilation network calculation Program “,” large section roadway (cave) support calculation “,” shaft wall structure design calculation program “,” legislation Shaft equipment set