济钢热连轧生产线高压水除鳞泵站有2套系统,旧系统为重庆泵组,能耗大,除鳞压力低,氧化铁皮清除不彻底,设备故障率高;新系统为格瑞德泵组,运行比较稳定,但新旧2套系统不兼容,制约着生产的稳定运行。通过对重庆高压水除鳞泵组进行节能改造,对除鳞箱、除鳞集管及管路进行优化,对两套系统的接口及控制方式进行融合,优化了泵组的运行模式,降低了能源消耗,提高了除鳞压力及除鳞效果,保证了钢板表面质量。
Jinan Iron and Steel hot rolling production line of high-pressure water descaling pump station has 2 sets of systems, the old system for the pump group in Chongqing, energy consumption, descaling pressure is low, iron oxide skin removal is not complete, equipment failure rate is high; the new system Grund Pumps, relatively stable operation, but the old system is not compatible with two sets, restricting the stable operation of production. Through the energy-saving reconstruction of Chongqing high-pressure water descaling pump group, the descaling box, descaling header and pipelines are optimized, and the interface and control mode of the two systems are merged to optimize the operation mode of the pump group and reduce Energy consumption, increased descaling pressure and descaling effect, to ensure the quality of the steel surface.