五强溪水电站总装机容量120万kW,共装设5台单机容量为24万kw的水轮发电机组,多年平均发电量53.7亿kWh,保证出力25.5万kW。计划1994年第一台机组建成投产,1995年、1996年各投产2台机组。根据湖南省国民经济发展计划,预测到2000年全省需要负荷1000万kW,需电量550亿kWh。为满足全省负荷电量的需要,五强溪水电站全部建成后将主供湖南电网,以缓和全省缺电的局面。以五强溪水电站为中心,建
Wuqiangxi Hydropower Station with a total installed capacity of 1.2 million kW, a total of five installed capacity of 240,000 kw single hydro-generator sets, the average annual production of 5.37 billion kWh, to ensure that output of 255,000 kW. It plans to put into operation the first unit in 1994 and put into operation two units in 1995 and 1996 respectively. According to the plan for national economic development in Hunan Province, it is predicted that by the year 2000, the province will need 10 million kW of load and 55 billion kWh of electricity required. In order to meet the needs of the province’s load power, Wuqiangxi Hydropower Station will be built mainly for the Hunan power grid to ease the situation of the province’s power shortage. To Wuqiangxi Hydropower Station as the center, built