一、概述: 太平哨水电站为引水式电站,引水系统包括两条主洞,两座调压井,四条压力管道。1~#2~#管道各长131.96米,3~#4~#各长175.95米。内径6.0米,最大设计水头62米(包括水锤
论文部分内容阅读
一、概述: 太平哨水电站为引水式电站,引水系统包括两条主洞,两座调压井,四条压力管道。1~#2~#管道各长131.96米,3~#4~#各长175.95米。内径6.0米,最大设计水头62米(包括水锤作用)。在管道下水平段末端设有钢板衬砌段,1~#钢衬段长25米。2~#长20米,3~#4~#各长15米,钢板厚12毫米,钢衬外包1.0米厚素混凝
I. Overview: Taiping Whistle Hydropower Station is a water diversion power station. The diversion system consists of two main tunnels, two surge tanks and four pressure pipes. 1 ~ # 2 ~ # pipe length of 131.96 meters, 3 ~ # 4 ~ # each 175.95 meters long. 6.0 meters in diameter, the maximum design head 62 meters (including the role of water hammer). In the end of the horizontal section of the pipeline with steel lining section, 1 ~ # steel lining 25 meters long. 2 ~ # 20 meters long, 3 ~ # 4 ~ # each 15 meters long, steel thickness 12 mm, steel lining outsourcing 1.0-meter thick thick coagulation
其他文献
众所周知 ,无定形二氧化硅材料因其热膨胀系数低而具有十分优良的抗热震性能。但是在再加热过程中无定形二氧化硅的晶化会使其抗热震性能降低。有人对无定形二氧化硅的结晶行
目前测定食用合成色素的方法不多,研究报导亦少,有人应用极谱法测定,但只是对某种色素的分析[1、2、3]。现行国家标准分析方法有高效液相色谱法和薄层色谱法[4],前者灵敏度及准确度高,但仪
一、概论大体积混凝土壩由于水泥水化热而使温度升高,当冷却后混凝土发生收缩,而基础岩石是不收缩的,因此限制了混凝土的自由收缩,致使壩身产生裂缝。另外由于壩面的混凝土
本文介绍了3FG-2减水缓凝剂对具有不同矿物组成的硅酸盐水泥水化的影响,并通过物化分析方法,研讨了3FG-2影响硅酸盐水泥浆或混凝土凝结特性方面的作用过程。指出了硅酸盐水泥
下面所提的一些问题可作为长江水利枢纽下一设计阶段中讨论和研究的对象。问题均以三峡水利枢纽南津关壩区为例。一、不用围堰修建六壩
Some questions mentioned below ca
一、水能资源及水资源△地表水资源(河川径流量)最多的国家:巴西,56,680亿米~3。△人均水量最多的国家:法属圭亚那,1,714,286米~3(1979年)。△水能资源蕴藏量最多的国家:中
提高苯酚生产效率新技术 日本新器铁化学公司开发出一种能显著提高苯酚生产效率的新技术。该技术的关键是可控制苯酚生产过程中催化反应的氧浓度 ,大大降低以甲苯为原料的装
1981年10月,水利部在武汉举办了环境水利研究班,参加研究班的大都是各省、市、自治区水利(水电)厅(局)、各流域机构、部属设计院、有关工程局、科研所、大专院校等单位的技
在西北黄土丘陵溝壑区修建小型水庫工程时,因为到处都是黄土,所以黄土就成为当地筑坝的主要材料。查清土揚的地質情况、工料性質、儲藏量等,是作好施工計划土場布置的主要条
1.中途裸眼测试口袋过长时:(1)对石炭岩地层,可利用选层锚支撑,用BT封隔器进行测试;(2)对砂泥岩地层,仍需采用井底支撑。但在选择井底支撑尾管时,可考虑用5″加重钻杆代替6″钻