论文部分内容阅读
一、概述由于水库蓄水以后引起的库岸变形将牵涉到许多国民经济建设的问题,如:铁路、耕地、居民点及建筑物均受到威协,坍岸的结果将会造成水库的补充淤积并使高程与面积容积关系有所改变,影响到水库的运用及蓄水量。因此在进行水库设计及管理时应考虑岸绿变形的影响,并需拟定出預测及防护变形的方法。官听水库于1953年汛期开始拦洪,1955年8月开始逐渐蓄水,1956年进入正常运用。岸缘一部分地区由于水位上涨,并受到强烈的风浪的作用,因此发生了较快的坍塌。为了解坍岸情况并搜集资料
I. Overview As a result of the reservoir bank deformation caused by the reservoir bank deformation will involve many problems of national economic construction, such as: railways, arable land, settlements and buildings are subject to the Association, the collapse of the reservoir will result in the accumulation of sedimentation And the relationship between the elevation and the volume of the area has changed, affecting the reservoir utilization and water storage. Therefore, during the design and management of reservoirs, the influence of the deformation of shore green should be considered and methods of forecasting and deformation protection should be worked out. Official listen to the reservoir in flood season in 1953 began to block flood, August 1955 gradually began to impound, 1956 into normal use. As a result of the rising water level in some parts of the coast and the intense storm waves, a rapid collapse occurred. To understand the collapse of the bank and collect information