甘豪煤矿副立井筒为素混凝土井壁,采用金属移动模板自上而下短段掘砌施工。由于井筒较深(从井口至井底水窝478米),穿过含水层及施工不善等原因,井筒施工完毕后,在井壁上出现数处出水点,井筒淋帮水达18.16米~3/时,局部井壁强度低于设计标号,有蜂窝麻面存在,达不到验收规范规定“总淋水量不得超过10米~3/时”的要求。
Ganhao mine shaft vertical shaft for the prime concrete shaft wall, using metal moving template from top to bottom short section digging construction. Due to the deep wellbore (478 meters from the wellhead to the bottom of the well), through the aquifer and poor construction and other reasons, after the wellbore construction is completed, there are several discharge points on the well wall, and the wellbore pouring water reaches 18.16 m ~ 3 /, The strength of the local wellbore below the design label, there is a honeycomb Ma face, not up to the acceptance of the provisions of the “total amount of water should not exceed 10 m ~ 3 / hour” requirement.