南部采选公司露天矿的设计和建设工程分为五期,全部建成后,原矿的年开采能力从900万t增加到3550万t。目前,该矿每年开采的3550万t矿石需剥离1380万m~3的岩石。该矿在“斯凯列瓦特斯基-马格涅季托维”采区开采坚硬的未氧化的含铁角岩(普氏硬度系数,f=18~20)。
The design and construction of the open pit mining company in Southern Mining Company is divided into five phases. After all of the projects are completed, the annual mining capacity of the ore mine will increase from 9 million t to 35.5 million t. Currently, 35.5 million tons of ore mined annually in this mine need to be stripped of 13.8 million m 3 of rock. The mine is mining hard, non-oxidic hornblende (Prussia hardness coefficient, f = 18-20) in the mining area “Sklewartatzki-Magneti-Tovevi”.