引黄工程总干三级泵站侧向进水前池水工模型试验研究

来源 :山西电力 | 被引量 : 0次 | 上传用户:litianjin
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
介绍了通过水工模型试验提出的引黄入晋工程总干三级泵站侧向进水前池的优化体型及为调整水流结构而采取的整流板等工程措施 ,这些措施使泵站进水前池中水流流态平稳 ,流速分布均匀 ,避免了在各种工况下前池中产生螺旋流及水面串通漏斗漩涡 ,能保证水泵安全、正常、高效运行 This paper introduces the optimized shape of the lateral inflow forebay of the general trunk pumping station of the Yellow River diversion project and the rectifying plates and other engineering measures adopted for adjusting the water flow structure proposed by the hydraulic model test. These measures make the pumping station enter the water The water flow in the front pool is stable and the flow velocity is evenly distributed, which avoids the spiral flow and the surface columnazet spiral whirlpool in the pre-tank under various operating conditions, which ensures the safe, normal and efficient operation of the pump
其他文献
目的探讨术中神经电生理监测应用于颈椎管内肿瘤手术的临床意义。方法2010年至2014年颈椎管内肿瘤手术患者46例,23例应用术中神经电生理监测(intraoperative neurophysiological monitoring,IONM ),为监测组;23例未应用IONM监测(对照组),对两组患者的一般临床资料、手术资料、神经功能改善情况进行比较,分析术中神经电生理监测在预测患者术后神经功能
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
坝基中存在松散覆盖是产生渗漏的首要条件 ,渗漏量过大 ,直接影响工程效益 ,且因渗漏力的长期作用下 ,将产生颗粒位移管涌破坏。为此防渗处理方案选择是十分必要的。通过对横
期刊
目的探讨后内侧入路治疗胫骨后侧平台双髁骨折的早期临床疗效。方法回顾性分析2010年10月至2013年12月,采用后内侧入路钢板螺钉内固定治疗13例胫骨后侧平台双髁骨折患者资料,男8例,女5例;年龄26~62岁,平均(41.5±6.6)岁;左侧7例,右侧6例。采用膝关节后内侧倒"L"形切口,后内侧髁使用胫骨后内侧解剖锁定钢板或"T"形加压钢板固定,后外侧髁使用3.5 mm"T"形接骨板支撑固定,骨缺
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥