广西来宾县清水河引水工程系1955年建成,原設計灌溉面积35,000亩,但由于渠道漏水严重,历年实际灌溉面积只有19,400亩,仅为原設計的55.4%。这条渠道漏水达到这样严重的情况:灌溉水3.5立方米/秒,从引水口仅流經28公里卽全部漏完,自28公里处以下一段长10多公里的渠道,从来沒有見到过水。更
Guangxi Laibin Qingshui River Diversion Project was completed in 1955 with an original designed irrigation area of 35,000 mu. Due to serious water leakage, the actual irrigated area over the years was only 19,400 mu, only 55.4% of the original design. This channel leakage to achieve such a serious situation: Irrigation water 3.5 cubic meters / second, only 28 kilometers from the diversion port 卽 all drained, since 28 kilometers below a section of more than 10 kilometers of channels, have never seen the water . more