山西铝厂是国家六五、七五、八五期间的重点项目之一。从1983年7月一期工程开工到1994年底二期工程全面建成,形成了年产氧化铝120万吨的设计能力。其中一期工程引进德国氢氧化铝闪速焙烧技术、关键设备及自控仪表。二期引进法国、丹麦等国家的高压溶出,氢氧化铝气体悬浮焙烧技术及关键设备,签署引进合同64项,总价4700多万美元。二期又分两部建设,
Shanxi Aluminum Plant is one of the key projects during the period of 65th, 75th and 85th of the country. From July 1983, a project started to the second phase of the project completed in late 1994, forming an annual output of 1.2 million tons of alumina design capability. One of the first phase of the project introduced the German aluminum hydroxide flash roasting technology, key equipment and self-control instrumentation. The second phase introduced France, Denmark and other countries of high pressure dissolution, aluminum hydroxide gas suspension roasting technology and key equipment, signed the introduction of 64 contracts, with a total price of 4700 million US dollars. Two is divided into two parts construction,