1.质量指标满负荷。工程质量要求消灭不合格品,一级品率不少于三分之二;产品质量在达到国家计划的同时,努力达到本行业同期最好水平。2.安全工作满负荷。百万吨死亡率要在控制指标以下,争取向零进军,地面要消灭重伤以上事故。3.经营工作满负荷。具体指标包括吨煤售价、销售收入、品种煤销售量、材料和备件计划兑现率。
1. Quality indicators at full capacity. Quality requirements of the project eliminate unqualified products, a product rate of not less than two-thirds; product quality in achieving the state plan at the same time, strive to achieve the industry’s best level over the same period. 2. Safety at full capacity Million tons of mortality below the control targets, strive to march zero, the ground to eliminate serious injuries and above accidents. 3. Operating full load. Specific indicators include the price of tons of coal, sales revenue, sales of varieties of coal, materials and spare parts planned cash rate.