钦乔克斯克矿在掘进通往主斜井的运输石门时,试验了采用5BC15型自行矿车的倾斜石门新掘进工艺。采用2-2型凿岩装载机装岩。装载站装备有CP—70型运输机的短(4个溜槽)传动装置和—8型矿车的MK—6型调车绞车。为了加长自行矿车运距,在巷道顶板的滑动电缆吊钩上悬挂一段附加的普通矿用电缆(长110米)。新工艺与现有工艺的主要区别和优点是,前者既能利用自行矿车运输矿石,又能将材料运入工作面。同时排除了定期接长和装卸运输设备的繁重手工作业。此外,新工
The Chinchoksk mine tested the new Shing Mun tunneling technology with a 5BC15 self-propelled mine trolley while driving the Shingle gate to the main inclined shaft. 2-2 using rock loader loader rock. The loading station was equipped with a short (4 chute) transmission of the CP-70 transport and a MK-6 shunting truck of the type-8 mine. In order to lengthen its own delivery distance, an additional ordinary mining cable (110 meters long) is hung on the sliding cable hook on the roof of the roadway. The main difference between the new process and the existing process and its advantages is that the former can both transport the ore by means of a self-transporting tub and transport the material into the working surface. At the same time ruled out the regular pick-up and handling heavy transport equipment manual. In addition, new workers