论文部分内容阅读
北京市新建的八达岭过境公路是一条Ⅱ级公路,沿德胜沟河上溯,在德胜口、姑娘台、黄土咀、陡岭几次跨河,黄土咀大桥是其中的一座,亦是通往风景区路上的点缀。建桥方案经反复比较,并与施工单位协商,拟定昌平端为2孔8米普通钢筋混凝土简支弯板,主桥为25+32+25米普通钢筋混凝土箱形连续曲梁,桥全长108米。该桥于一九七九年十一月由交通部第二公路勘察
The newly-built Badaling Transit Road in Beijing is a Grade II highway running up the Deshengou River. It is one of the two crossing the river at Deshengkou, Girl’s Station, Huangtuizu and Douling and the Huangtu Tsui Bridge. Scenic spots on the road. Bridge construction program after repeated comparison, and consultation with the construction unit, to draw Changping-side 2 holes 8 meters ordinary reinforced concrete simply supported bent plate, the main bridge for the 25 +32 +25 meters ordinary reinforced concrete box-girder, curved bridge full length 108 meters. The bridge was surveyed by the Second Highway of the Ministry of Communications in November 1979