工程经济管理存在的风险及防范措施

来源 :城市建设理论研究(电子版) | 被引量 : 0次 | 上传用户:zhangjianmei88
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
随着社会经济的不断发展,市场竞争也越来越激烈,工程所涉及到的环节也越来越繁多,而每个环节中又都存在成本的核算问题。因此,在工程项目管理过程当中,必须对整个工程施工过程进行严格的经济管控,只有这样才能有效降低财务管理的风险。本文首先分析了目前工程经济管理中存在的风险问题,然后提出了工程经济管理风险的一系列防范措施,希望能够为工程的经济管理工作带来些许的帮助。 With the continuous development of social economy, the market competition is more and more fierce. There are more and more links involved in the project, and there are cost accounting problems in every link. Therefore, in the project management process, the entire project construction process must be strictly controlled by the economy, the only way to effectively reduce the risk of financial management. This paper first analyzes the existing risk problems in the engineering economic management, and then puts forward a series of preventive measures to manage the risks of the engineering economics. It hopes to bring a little help for the economic management of the project.
其他文献
不惜工本招聘人才 美国政府对公司企业招聘员工,除反种族,性别及年龄歧视行为之外,基本上不加限制。松动的政府政策为美国员工在国内市场上高度流动打下了基础。 由于美国公
1下午六点,真是一个让人厌恶的时间。路上的乞丐和发传单的孩子们开始忙碌地工作了。这时,一个面黄肌瘦的男孩拿着一摞广告单,面带微笑地敲打沈聪车窗。沈聪不耐烦地挥挥手,
“大家好!我是苍蝇导游小姐,欢迎你们的到来,下面我将带领大家去我们的世界走一趟。”你们看,这里是露天食品超市,被人类称为垃圾场。这里的东西全免费,喜欢什么随便拿。这是
《溪凫(fu)图》(纸本设色,纵35.7厘米,横47.5厘米,今为台北故宫博物院收藏,见上图)是元代画家陈琳主笔、赵孟頫(fu)润色的花鸟画。陈琳是元代著名文人画家,字仲美,钱塘(杭州
全国第二届低热值煤气民用技术研讨会于十月廿五日至卅一日在庐山召开。参加这次会议的共有19个省、市、自治区,76个单位、126名代表。会上宣读论文26篇,参观了中科院庐山疗
对于土建综合工长来说,除了掌握土建方面的施工知识外,还必须加强对暖卫、电气等分部工程的基本知识和施工管理的了解。一、首先要认真审阅图纸。在开工之前,土建工长除认真
我的爸爸可是个能干的“家庭妇男”。只要妈妈不在家,他就是全职的后勤部长。这天,妈妈又出去办事了,他便围上围裙,拿起两个大锅铲,在厨房里“舞枪弄棒”。不到十分钟,两大碗
今天是台风,风特别大,我家的窗子震得快破了,院子里的几棵树被连根拔起,真是惨不忍睹。风婆婆大概是真生气了,连她最爱的小花园也弄得枝折花落,花瓣满天飞,我好像嗅到了花瓣
话题作文取材广泛,许多考生懂得这个道理。但在考场上面对话题作文时,这些考生又往往无从下手,只好东拼西凑成文,作文选材出现平面化、低幼化倾向,缺乏鲜活性和冲击力。这主
复合预还原球团矿的试验研究[印度]T.Sharma1前言预还原球团矿是电炉中代替废钢的良好原料。尽管应用预还原球团矿具有一系列优点,但由于其热耗大和耐风雨侵蚀能力差,它们还没有广泛应用于