我厂原来是以修为主,修造并举的筑路机修厂,1981年8月根据调整改革的方针,调整为专业化路面施工队(对外仍为机修厂),现有国产筑路施工机械、车辆、设备38台(部)。对沥青路面面层施工基本达到流水线作业,其任务:担负全段改建、大修路面施工及自用筑路机械的大、中修任务,自调整后的三年来,工程年年有节余,质量年年有提高,工程合格率均为100%,工人
In 1981, according to the principle of adjusting the reform, we adjusted to a professional pavement construction team (the external is still a mechanic factory), the existing domestic road construction machinery, Vehicles, equipment 38 Taiwan (Ministry). The construction of the asphalt pavement basically reached the assembly line tasks, and its task: to undertake the entire section of reconstruction, overhaul pavement construction and self-use road construction machinery, repair tasks, since the adjustment of the three years, the project savings every year, the quality of every year Have improved, the project pass rate was 100% of workers