论文部分内容阅读
围绕布尔诺建设的环形公路,穿山部分建全长510m的隧道,其中285m为暗挖,225m为明挖。隧道设计成两孔,每孔2车道,两孔间距仅49m。隧道断面的开挖高度86m,开挖宽度13m,坡度53%。隧道按新奥法设计,初期支护厚300mm,玻璃纤维锚杆,防水层为PVC膜,与排水系统和侧向排水沟相
Around the circular road built in Brno, part of the tunnel is built with a total length of 510m, of which 285m is undercutting and 225m is open excavation. The tunnel is designed with two holes, two lanes per hole, and the distance between the two holes is only 49m. Tunnel section excavation height 86m, excavation width 13m, gradient 53%. The tunnel is designed according to the New Austrian law. The initial support thickness is 300mm. The fiberglass anchor and waterproof layer is PVC membrane, which is connected with drainage system and lateral drainage channel