综合地质超前预报在齐岳山隧道施工中的应用

来源 :地质灾害与环境保护 | 被引量 : 0次 | 上传用户:vivi8133
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
在长大隧道施工过程中,由于工程地质条件的复杂性和不确定性,常会出现如塌方、涌水等地质灾害,为了规避这些地质灾害的发生,在施工过程中实施综合地质超前预报就显得十分有必要。本文以宜(昌)—万(州)铁路齐岳山隧道PDK366+020~PDK365+984段为实例,详细介绍地质分析-TSP地震勘探-超前水平钻探相结合的综合地质超前预报方法,结果证明,该方法具有较高的精度和准确度。 Due to the complexity and uncertainty of engineering geological conditions, geological disasters such as landslides and gushing water often occur during the construction of long and narrow tunnels. In order to avoid the occurrence of these geological disasters, it is quite obvious that the implementation of comprehensive geological advance forecast in the process of construction Is necessary. This paper takes the section of PDK366 + 020 ~ PDK365 + 984 of Qiyueshan tunnel of Yichang-Wanzhou Railway as an example to introduce the method of comprehensive geological prediction combining geological analysis, TSP seismic prospecting and advanced horizontal drilling. The results show that, The method has high accuracy and accuracy.
其他文献
承台施工是秦淮河船闸下游靠船墩改造工程的关键施工工序,本文主要对施工单位的承台专项方案作出了审核意见,以确保施工安全顺利。 The construction of caps is a key cons
据统计,近年来,我国危险化学事故呈明显上升趋势,群众生命财产遭受重大损失,同时使环境受到污染,造成严重社会影响.本文结合近年来公路运输中槽罐泄漏典型事故,从人为因素、
目前鄱阳湖湿地生态旅游的发展还处于初级阶段,还存在一系列的问题,其中最重要的是管理体制混乱.因此,当务之急是理顺其管理体制.用合作博弈的理论论证了建立一个由政府、旅
西藏冈底斯铜多金属成矿带是我国西部的重点成矿区带之一,带内发育大规模以燕山期一喜马拉雅期岩浆作用为主的铜铁多金属矿床组合,成矿条件十分有利.近年来在冈底斯成矿带开
Previous studies have shown that meridional displacement of the East Asian upper-tropospheric jet stream (EAJS) dominates interannual variability of the EAJS in
本文在分析国内外校企合作促进科技发展的模式、新建本科院校科技发展存在问题的基础上,提出了新建本科院校通过校企合作促进科技发展的措施.
沥青路面是我国的路面结构形式之一,半刚性基层沥青路面较为普遍.裂缝是半刚性路面早期破损最常见的病害之一,它的危害在于从裂缝中不断进入水份使基层甚至路基软化,导致路面
近些年来,由于对煤田的大力开采,引发了很多问题.本文主要简析我国主要的煤田分布状况,阐述了当前我国煤田开采中存在的问题,并就这些问题提出了相关的建议和对策.
以凌阳16位单片机SPCE061A为控制中心,配合LCD501液晶模组及HS1101电容式湿度传感器,通过SPCE061A的Feedback功能构成RC反馈振荡电路,完成湿度传感器从电容到频率的转换,从而
以黄河三角洲垦利县为研究靶区,采用多时相陆地卫星TM 数据,对耕地的动态变化及其驱动力进行了系统研究.采用人机交互式的目视解译和人工修正方法提取耕地信息,以分类后比较