伊拉克Derbendi Khan坝建于1964年。1967年紧靠大坝的上游库岸发生了滑动,特别是右岸的滑坡有引起2百万立方米的滑体堵塞引水道的威胁。当年秋季放空水库时,第一次记录到滑坡前沿移动2米;1969年一次放水后,再次移动40厘米;1970年又移动20厘米。从此,对每年放空水位严格限制在445米高程以上,保持滑坡体稳定。 1976年建立了一套滑坡监测系统,包括5条衬有特殊套管的钻孔,长度35米到120米.利用MPF钻孔
Derbendi Khan dam in Iraq was built in 1964. In 1967, the upper bank near the dam slipped. In particular, the landslide on the right bank caused 2 million cubic meters of slide to block the diversion channel. When the reservoir was emptied in the autumn of that year, it was the first recorded movement of 2 meters to the front of the landslide; once it was drained in 1969, it moved 40 centimeters again; in 1970, it moved 20 centimeters. Since then, the annual clearance of water levels strictly limited to 445 meters above the elevation, to maintain landslide stability. A landslide monitoring system was established in 1976 that included five bored special bushing lengths ranging from 35 to 120 meters.