论文部分内容阅读
动车与动车组是两个完全不同的概念。所谓动车组是指由若干带动力动车与非动力车依照预定的参数组合在一起,然后按照正常使用寿命之类始终以固定的编组运行,在运行过程中不可随便编组的一组列车。动车组技术实际上来源于地铁,是一种动力分散技术。而文中所说的动车组安装,也主要是指城市建设之中,地铁、轻轨等交通设施的建设。本文通过对动车组安装进行大概论述,进而探讨其安装中技术的使用问题,并提出对应的解决措施。
EMU and EMU are two completely different concepts. The so-called EMU refers to a number of powered cars and non-powered vehicles in accordance with the predetermined parameters combined together, and then in accordance with the normal service life and the like always a fixed set of operations, in the course of operation can not be grouped by a group of trains. EMU technology actually comes from the subway, is a dynamic dispersion technology. The article said EMU installation, but also mainly refers to the construction of the city, the subway, light rail and other transport facilities. This article discusses the installation of EMU, and then discusses the use of technology in its installation, and puts forward corresponding solutions.