后浇带的范围是很广泛的,如高层建筑主体与裙楼的连接,高层框架结构或超长多层的混凝土的收缩应力与混凝土的收缩变形也可以应用后浇温度带或后浇收缩带。所以,应当重视后浇带的施工,严格按照设计要求做出后浇带预留,同时依照规定时间浇筑混凝土,在浇筑前清理干净表面,并对钢筋进行处理,之后再浇筑混凝土。在施工过程中要加强检查和监督,保障后浇带的质量,以确保工程达到良好的使用性和完美性。
After pouring with a wide range of areas, such as the main high-rise buildings and podium connections, high-rise frame structure or long multi-layer concrete shrinkage stress and concrete shrinkage deformation can also be applied after pouring temperature zone or after pouring shrink . Therefore, we should attach importance to the construction of the post-pouring zone, and make the post-pouring zone strictly according to the design requirements. At the same time, pour the concrete according to the specified time, clean the surface before pouring, treat the rebar and then pour the concrete. In the construction process to strengthen the inspection and supervision to ensure the quality of post-pouring with the project to ensure good usability and perfection.