输水,特别是冰期输水,用闸站控制水面线是引黄济青工程调度运行的成功经验。本文对冬季运行水面线控制进行经验探析。1 水面线自然趋势 1989年全线通水之后,经过1个多月的稳定运行,潍坊辖段于12月30日在全线进行了一次严格的水面线测绘。宋庄泵站6台机组连续运行,前池水位保持不变,测定过站流量33m~3/S,为设计流量的94%;王耨泵站4台大机、2台小机连续运行,前池水位亦保持不变,测定过站流量28.8m~3/S,为设计流量的96%。测前控制条件是:各间站闸门全部开启自由过流,宋庄、王耨两泵站前池水
Water conveyance, especially during the ice period, and the control of the water surface with the sluice station are the successful experiences of the Yellow River Jiqing project scheduling operation. This paper analyzes the winter operation of water line control experience. 1 natural trend of water line After all the water in 1989, after more than a month of stable operation, Weifang jurisdiction on December 30 across the board conducted a rigorous water line mapping. Six units of Songzhuang Pumping Station were continuously operated with the water level in the forecourt kept unchanged. The measured flow rate was 33m ~ 3 / S, which was 94% of the design flow rate. Four large machines and two small machines of Wangtao Pumping Station were in continuous operation. The water level in the pond also remained unchanged. The measured total station flow was 28.8m ~ 3 / S, which was 96% of the designed flow rate. Pre-test control conditions are: all stations gate all open free flow, Songzhuang, Wang 耨 two pumping station in front of the pool of water