施工单位如何处理好质量、工期和造价的关系

来源 :才智 | 被引量 : 0次 | 上传用户:doodoo
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
质量、工期、造价是工程预期目标的具体量化指标,三者的目标是一致的那就是努力实现社会效益的最大化,但三者在管理中又各有侧重,具体实施时又存在矛盾并相互制约,处理不当将会给社会造成巨大损失;施工单位如何处理好三者的关系是保证实现工程社会综合效益的重要环节,也是施工单位能在市场竞争中立足的必要保证;通过实践 Quality, construction period and cost are the specific quantitative indicators of the project’s expected objectives. The three objectives are the same, that is, efforts are made to maximize the social benefits. However, the three have different emphases in their management. In actual implementation, they have contradictions and mutual conflicts Control and improper handling will result in enormous losses to society. How to handle the relationship among the three is an important link to ensure the comprehensive benefits of engineering society, and is also a necessary guarantee for construction units to gain a foothold in market competition. Through practice
其他文献
建筑工程施工由于多为露天作业,施工环境复杂,人员流动大,安全生产事故较为突出。本文在细致分析当前建筑工程安全施工现场管理常见问题的基础上,有针对性的提出了相应的解决
一、高强混凝土的发展及应用高强混凝土在国内外已有比较多的应用。在欧美一些国家在众多幢高层建筑采用高强混凝土并且取得了显著的经济效益,最高的混凝土强度达到了130Mpa
企业年检是海关对报关单位进行行业管理的一项重要制度 海关对未参加年检的报关单位和报关员将依法予以处罚。 Annual inspection of enterprises is an important system f
本文浅析建筑幕墙的分类,以点支承玻璃幕墙为例谈了建筑幕墙的结构,对幕墙结构现场安装值得注意的问题进行了总结,并阐述了建筑幕墙施工流程,望能给具体的施工提供参考。 Th
随着城市化进程加快及其城市经济迅猛发展,人们对住宅的舒适度、合理性、节约型等提出了更高的要求和标准.绿色建筑是可持续发展理念的具体体现,具有节约资源、降低污染、环
在当代城市功能日趋发展与完善的今天,城市市政设施正常发挥其功能已离不开排水水系统的建设.本文根据排水管道工程施工的各阶段进行研究分析,对施工方案的具体措施及手段进
引言随着国家经济的迅速发展,人民的生活需求也在日渐提高,对于建筑电气安装工程的要求也不仅仅局限于照明设备、家电设备的供应,现在人们更加注重的是电气安装的美观、适用
渗透问题是水利工程的主要病症。渗透问题的存在使水利工程不能正常运转且不能充分水利工程的经济效益,还严重威胁着下游群众的生命财产安全。本文对水利工程渗水形成及原因
橡胶坝在运行过程中经常会发生很多损坏,如何有效的应对这些损坏,加强橡胶坝管理已经刻不容缓。本文就这个问题开展研究,提出一些解决问题的方法。一、橡胶坝的损坏分析。(1)
【摘要】不动产登记,有助于明确产权分布,保护产权拥有人利益。为了确保人们创造财富的激情,就需要创建完善的不动产登记管理系统,才能在保证人们财产的同时推动有关产业的跨越式进步。本文主要结合实际状况,分析现阶段不动产登记遇到的问题,提出完善措施,以供参考。  【关键词】不动产登记;问题;措施  随着市场经济的发展,以及历史、自然和社会等因素的影响,致使在不动产登记中遇到各种各样问题。以下将结合实际经验