1 岩滩水电站设计概算审批及调整情况1.1 岩滩水电站概况岩滩水电站位于红水河中游广西大化县境内,由坝址经大化县城至南宁公路全程230km。本电站以发电为主,兼有航运等综合效益,水库正常蓄水位223m,死水位初期为204m,总库容33.4亿 m~3,有效库容15.3亿m~3,属于不完全年调节电站。水电站的主要建筑物有:溢流坝及左右岸挡水坝,坝型为混
1 YANTAN HYDROPOWER PLANT APPROVAL OF THE DESIGN AND ADJUSTMENT 1.1 Overview of Yantan Hydropower Station Yantan Hydropower Station is located in Dahua County of Guangxi in the middle reaches of Hongshui River and extends 230km from Dahua County to Nanning Highway. The power station is mainly power generation with the combined benefits of shipping and other functions. The normal reservoir water level is 223m, the initial stage of dead water level is 204m, the total storage capacity is 3.34 billion m 3, and the effective storage capacity is 1.53 billion m 3. The main hydropower station buildings are: overflow dam and left and right retaining dam, dam type for the mix