论文部分内容阅读
长江大桥通车第二日【新华社武汉1957年10月16日电】武汉长江大桥正式通车后的第二天,长江上遇到了八级狂风,江面白浪滔滔,武汉市悬起了“风大浪急轮渡停航”的公告牌。但是,长江大桥却接待了南来北往的火车、汽车和络绎不绝的人群。三门峡水利枢纽工程发挥作用【新华社郑州24日电】黄河洪峰今天过了花园口。当洪峰在今晨零时到达花园口站时,流量只有六千秒立方米。如果没有三门峡水利枢纽工程拦蓄了部分洪水,花园口站的流量要达一○五○○秒立方米。
On the second day of the opening of the Yangtze River Bridge [Xinhua News Agency, Wuhan, October 16, 1957] On the second day after the official opening of the Wuhan Yangtze River Bridge, eight typhoons were encountered on the Yangtze River. The white waves on the river surged up and the “ Ferry suspended ”bulletin board. However, the Yangtze River Bridge has hosted the train from south to north, cars and an endless stream of people. Sanmenxia Hydro Project to play a role 【Xinhua News Agency, Zhengzhou, January 24】 The Yellow River peak passed Huayuankou today. When Hongfeng arrived at Huayuankou Station at 0:00 this morning, the flow rate was only 6,000 cubic meters. If there is no part of the Sanmenxia water conservancy dam project savings, Huayuankou station flow to reach 1,00500 seconds cubic meters.