论文部分内容阅读
加拿大曾派遣一个由11人组成的模具代表团考察日本的模具工业。该团先后访问了关西、东海、关东等地的模具制造厂和模具加工设备制造厂等9个工厂,历时2周。现将他们访问日本模具工业后的感观介绍如下。该团访问的大多数是大型塑料模和压铸模制造厂。在这些工厂中多数已使用模具CAD/CAM,从而提高了整个模具加工过程的工作效率,生产过程的流转有条不紊,计划极为周密。为了缩短制模周期,日本模具工厂十分注重现场管理。在作业开始前,设备均需要完
Canada has sent a mold delegation composed of 11 people to examine Japan’s mold industry. The delegation visited 9 factories including mold manufacturing plant and mold processing equipment factory in Kansai, East China Sea and Kanto areas for 2 weeks. Now they visit Japan’s mold industry after the feeling is as follows. Most of the missions visited were large plastic mold and die-casting mold manufacturing plants. Most of these factories have used mold CAD / CAM, thus improving the efficiency of the entire mold process, the flow of production process methodical, the plan is very thorough. In order to shorten the molding cycle, the Japanese mold factory attaches great importance to the scene management. The equipment needs to be finished before the job begins