当兴建水电站时,巨大河流的截流工程是一项严肃的水利工程任务。由於改变水流的方向而产生的许多技术上的困难,对于水利工程师说来,是很感兴趣的。在拟订伏尔加河截流工程的计划时,曾经考虑了几个方案,这些方案可分为两种:一种方案规定截流工程必须停止航运;另一种方案规定截流工程不须停止航运。由於考虑到伏尔加河的航运和筏运的巨大的国民经济意义,和洪水过後随时能截流的愿望(只考虑水利枢纽主要建筑物的状况);而采取了截流工程不妨害航运利益的方案。
When building a hydropower station, the closure of huge rivers is a serious hydraulic engineering task. Many technical difficulties due to changing the direction of water flow are of great interest to hydraulic engineers. In the planning of the closure project of the Volga River, several options have been considered. The options can be divided into two types: one is that the closure works must be stopped and the other is that the closure works need not be stopped. Considering the great national economic significance of shipping and rafting on the Volga River and the desire to be able to intercept the river at any time after the flood (considering only the status of major structures of the water conservancy hub), a solution that does not affect the interests of shipping by river closure works has been taken.