立井液压滑模筑壁于1974年在潘集冻结试验井和潘一主井冻结段进行工业性试验,滑升183米,取得了成功。1975年在潘一副井进行扩大试验,滑升193米,实现了滑模筑壁与井底工作面预注浆平行作业。近年来,在淮南、淮北、邯邢、丰沛、开滦、兖州等矿区的30个井筒中推广应用,滑升超过6000米,对滑模装置、滑升工艺及控制方法进行了一系列的改进。1978年在鲍店北风井试验成功了“外滑”工艺,为滑模筑壁与掘进平行作业提供了有利条件。1979年在潘二西风井试验成功了滑升自控和自调平装置,基本上实现了滑模水平上升,滑模盘中心偏差进一步缩小,井壁质量更有
Vertical well hydraulic slide wall in 1974 in Panji freeze test well and Panyi main frozen section of the industrial test, sliding 183 meters, and achieved success. In 1975, an extended trial was carried out in Pan Yihao well, sliding up 193 meters to achieve the parallel operation of sliding mode construction wall and pre-grouting at the bottom of working face. In recent years, it has been popularized and applied in 30 boreholes in Huainan, Huaibei, Handan, Fengbei, Kailuan, Yanzhou and other mining areas with a sliding over 6000 meters, and a series of improvements have been made to the sliding device, sliding process and control method . In 1978, the “Outer Slip” process was successfully tested in the Bao Dian Beifeng well, which provided favorable conditions for the parallel operation of sliding mode construction and tunneling. In 1979, Panshan westerly well test successfully slides the self-leveling and self-leveling device, basically achieves the sliding mode level rise, the slide disk center deviation further narrows, the wall quality is more