Hydra-Process Control Software for Tunnel Boring Machines

来源 :第四届中国国际隧道工程研讨会 | 被引量 : 0次 | 上传用户:ydaf4rx3
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Data management and processing play a vital role for the success of large scale construction projects.This paper presents an example of how managing extensive data sets during complex tunneling projects.As an example the web-based software tool HYDRA is introduced which allows the monitoring of data gathered during the construction process leading to a efficient process control and optimization.The paper shows how large quantities of data from the electrical,hydraulic and surveying system can be stored and how they are correlated with data from the design,geology and settlement measurements.Furthermore,it is possible to extend the software into new web-tools comprising cut and wear prognosis or the management of separation plants.Data management using software tools like HYDRA reduce the work load on reporting and offer efficient ways of trigger value monitoring.
其他文献
本文根据工作经验,总结了绘画这一手段在高中生的心理辅导中的优势与应用.绘画操作简单,应用灵活,可解读空间,使其在心理辅导中有较大的利用价值.在高中阶段心理辅导中打破沉
目的:在供给侧结构性改革视角下,了解临沂市智慧居家养老服务发展现状,并提出相应的居家养老服务业供给侧改革思路,为促进本地区居家养老服务体系的建设和完善提供参考依据.
A large number of real-time data were acquired by high-precision electric-levelmeters which were laid inside M8 Line of Shanghai Metro,when the slurry-shield pa
本文针对上海青草沙原水过江管工程的长兴岛工作井深度超过40m的深基坑以砂性土为主的地层特点,重点介绍在⑥、⑧隔水层缺失情况下对坑底以下多层承压水的降压施工方案的设计
目的:《出生医学证明》延迟办理相关因素分析及对策.方法:选取我院2019年6月至2020年6月出生未办理出生医学证明新生儿300例,对出生1个月内未办理《出生医学证明》的新生儿采
本文以世博轴Ⅰ标基坑为背景,阐述了复杂地质条件下大型基坑逆作法施工时降水方案的设计及施工方法,详细介绍了疏干井和降压井“两井合一”技术在基坑施工中的应用.
Metro lines always run along heavy residential and commercial corridor,how to alleviate disruption of nearby residents and minimize environment impact are the m
会议
本文结合青草沙五号沟泵站工程实例,首次系统研究了软土地基内超大深基坑钢筋混凝土支撑爆破拆除所产生的爆破振动的负效应,分析了爆破振动荷载对结构的动力响应,判断爆破振
会议
现代化社会高速发展的背景下,高校图书馆的职能也发生了巨大变化,大学生阅读推广便是其关键工作之一.但是,从实际层面而言,当代大学生大多数不喜欢阅读,图书馆的阅读推广工作
The construction of Kent Ridge Station of Contract 855 of Circle Line Project in Singapore adopted a standard cut and cover method using contiguous bored piles
会议